您好,欢迎登录Mr.confs会先生官方网站!

Annual International Congress and Exhibition Hydropower Latin America

时间:2021-06-02 至 2021-06-03

Annual International Congress and Exhibition Hydropower Latin America
收藏0
Annual International Congress and Exhibition Hydropower Latin America
会议时间:2021-06-02 至 2021-06-03
会议地点: ,Bogot\u00e1,Colombia 周边酒店预订
主办单位: Vostock capital

发票类型: 不支持开票
参会凭证:其它

门票信息
暂无门票信息
会议介绍
Itaipú Binational holds the title of "biggest energy producer of the planet" with 103,098,366 MWh produced in 2016. The Itaipú dam has an installed electrohydraulic generation capacity of 14,000 MW, with 20 turbines generating 700 MW and its construction demanded a cost of 36 million dollars for the two partner countries. The Simón Bolívar Hydroelectric Power Plant is the third largest in the world with its 10,235 MW of total installed capacity The power generation of this plant .. continue reading exceeds 47,000 GWh per year, capable of supplying an equivalent consumption close to 300,000 barrels a day of oil, which has allowed it to comply with the thermoelectricity replacement policy in order to save fuel. The energy produced by the dam is consumed by much of the country. It has a total installed capacity of 1,008 MW. Currently Ralco has a capacity of 690 MW, contributing 4.6% of the total energy generated in the Chilean electrical interconnection system. It is the power plant that brings more energy in the country.

参会指南
google-map

Venue to be announced

Bogotá, Colombia

Add Venue
会议地点
×