您好,欢迎登录Mr.confs会先生官方网站!

ICCSM 2020: 14. International Conference on Construction Scheduling and Methods

时间:2020-12-24 至 2020-12-25

ICCSM 2020: 14. International Conference on Construction Scheduling and Methods
收藏0
ICCSM 2020: 14. International Conference on Construction Scheduling and Methods
会议时间:2020-12-24 至 2020-12-25
会议地点: Vienna, Austria,Vienna,Austria 周边酒店预订

发票类型: 不支持开票
参会凭证:其它

门票信息
Participation Type Early Registration Fees Registration Fees
Non-Student Oral/Poster Presenter Registration € 450 € 500
Student Oral/Poster Presenter Registration € 350 € 400
Listener Registration € 250 € 300
Additional Paper Publication € 100
会议介绍

The International Research Conference Aims and Objectives

The International Research Conference is a federated organization dedicated to bringing together a significant number of diverse scholarly events for presentation within the conference program. Events will run over a span of time during the conference depending on the number and length of the presentations. With its high quality, it provides an exceptional value for students, academics and industry researchers.

ICCSM 2020: 14. International Conference on Construction Scheduling and Methods aims to bring together leading academic scientists, researchers and research scholars to exchange and share their experiences and research results on all aspects of Construction Scheduling and Methods. It also provides a premier interdisciplinary platform for researchers, practitioners and educators to present and discuss the most recent innovations, trends, and concerns as well as practical challenges encountered and solutions adopted in the fields of Construction Scheduling and Methods

Call for Contributions

Prospective authors are kindly encouraged to contribute to and help shape the conference through submissions of their research abstracts, papers and e-posters. Also, high quality research contributions describing original and unpublished results of conceptual, constructive, empirical, experimental, or theoretical work in all areas of Construction Scheduling and Methods are cordially invited for presentation at the conference. The conference solicits contributions of abstracts, papers and e-posters that address themes and topics of the conference, including figures, tables and references of novel research materials.

Guidelines for Authors

Please ensure your submission meets the conference's strict guidelines for accepting scholarly papers. Downloadable versions of the check list for Full-Text Papers and Abstract Papers.

Please refer to the Paper Submission Guideline, Abstract Submission Guideline and Author Information before submitting your paper.

Conference Proceedings

All submitted conference papers will be blind peer reviewed by three competent reviewers. The peer-reviewed conference proceedings are indexed in the Open Science Index, Google Scholar, Semantic Scholar, Zenedo, OpenAIRE, BASE, WorldCAT, Sherpa/RoMEO, and other index databases. Impact Factor Indicators.

Special Journal Issues

ICCSM 2020 has teamed up with the Special Journal Issue on Construction Scheduling and Methods. A number of selected high-impact full text papers will also be considered for the special journal issues. All submitted papers will have the opportunity to be considered for this Special Journal Issue. The paper selection will be carried out during the peer review process as well as at the conference presentation stage. Submitted papers must not be under consideration by any other journal or publication. The final decision for paper selection will be made based on peer review reports by the Guest Editors and the Editor-in-Chief jointly. Selected full-text papers will be published online free of charge.

Conference Sponsor and Exhibitor Opportunities

The Conference offers the opportunity to become a conference sponsor or exhibitor. To participate as a sponsor or exhibitor, please download and complete the Conference Sponsorship Request Form.

Selected Papers

  1. Investigation of Learning Challenges in Building Measurement Unit
    Argaw T. Gurmu, Muhammad N. Mahmood
  2. Resource Allocation and Task Scheduling with Skill Level and Time Bound Constraints
    Salam Saudagar, Ankit Kamboj, Niraj Mohan, Satgounda Patil, Nilesh Powar
  3. Low-Level Modeling for Optimal Train Routing and Scheduling in Busy Railway Stations
    Quoc Khanh Dang, Thomas Bourdeaud’huy, Khaled Mesghouni, Armand Toguy´eni
  4. Scheduling of Bus Fleet Departure Time Based on Mathematical Model of Number of Bus Stops for Municipality Bus Organization
    Ali Abdi Kordani, Hamid Bigdelirad, Sid Mohammad Boroomandrad
  5. A Mixed Integer Linear Programming Model for Flexible Job Shop Scheduling Problem
    Mohsen Ziaee
  6. The Effect of Critical Activity on Critical Path and Project Duration in Precedence Diagram Method
    J. Nisar, S. Halim
  7. A Construction Management Tool: Determining a Project Schedule Typical Behaviors Using Cluster Analysis
    Natalia Rudeli, Elisabeth Viles, Adrian Santilli
  8. Sunflower Irrigation with Two Different Types of Soil Moisture Sensors
    C. D. Papanikolaou, V. A. Giouvanis, E. A. Karatasiou, D. S. Dimakas, M. A. Sakellariou-Makrantonaki
  9. Pre- and Post-Analyses of Disruptive Quay Crane Scheduling Problem
    K. -H. Yang
  10. Time Overrun in Pre-Construction Planning Phase of Construction Projects
    Hafiz Usama Imad, Muhammad Akram Akhund, Tauha Hussain Ali, Ali Raza Khoso, Fida Hussain Siddiqui
  11. Empirical Study on Causes of Project Delays
    Khan Farhan Rafat, Riaz Ahmed
  12. Job Shop Scheduling: Classification, Constraints and Objective Functions
    Majid Abdolrazzagh-Nezhad, Salwani Abdullah
  13. Solving Weighted Number of Operation Plus Processing Time Due-Date Assignment, Weighted Scheduling and Process Planning Integration Problem Using Genetic and Simulated Annealing Search Methods
    Halil Ibrahim Demir, Caner Erden, Mumtaz Ipek, Ozer Uygun
  14. Strategic Mine Planning: A SWOT Analysis Applied to KOV Open Pit Mine in the Democratic Republic of Congo
    Patrick May Mukonki
  15. Solving Process Planning, Weighted Earliest Due Date Scheduling and Weighted Due Date Assignment Using Simulated Annealing and Evolutionary Strategies
    Halil Ibrahim Demir, Abdullah Hulusi Kokcam, Fuat Simsir, Özer Uygun
Ali Sarrafi Nik Islamic Azad Unversity, IR
Seyedmohammad Salehi University of Delaware, US
Rafaat Hussein State University of New York, US
Suresh Kamath MetLife Inc, US
Adebayo Fashina Gollis University , SO
Issam Miqdadi American University of Ras Al Khaimah, AE
Yasmeen Essawy The American University in Cairo (AUC), EG
Azin Fathianpour Massey University, NZ
Mostafa Fadaeefath Abadi Concordia University, CA
Hosam Elhegazy Future University in Egypt, EG
Aidin Delgoshaei Kharazmi University, IR
Saurav Dixit RICS SBE (School of Built Environment) Amity University, IN
Jalil Boudjadar Aarhus University, DK
Mohamed Enaba Cairo University, EG
Balasubramanian Karuppiah Bharath Institute of Higher Education and Research, IN
Ahmed Assad Concordia University , CA
Alfredo Soeiro University Porto, PT
Uchechukwu Awada University of St Andrews, GB
Milena Moteva University of Architecture, Civil Engineering and Geodesy, BG
Mohd Umzarulazijo Umar Universiti Sains Malaysia, MY
Hakan Altunay Firat University,
Khan Farhan Rafat Bahria University, Pakistan
Caner Erden Sakarya University, Turkey
Babak Tabrizi University of Tehran, Iran, Islamic Republic Of
Yong-Sung Kim Hanyang University, Korea, Republic Of
Ghorbanmohammad Komaki Case Western Reserve University, United States
Tommaso Adamo University of Salento, Italy
Zaki Khan Aligarh Muslim University, India
Asser Elsheikh Moscow State University of Civil Engineering, Russian Federation
Harold Robinson scad, India
会议日程
Abstracts/Full-Text Paper Submission Deadline   November 17, 2020
Notification of Acceptance/Rejection   December 01, 2020
Final Paper (Camera Ready) Submission & Early Bird Registration Deadline   November 26, 2020
Conference Dates   December 24-25, 2020
参会指南
会议地点
×